A current transformer ratio is usually written as a short pair of numbers — 300/1, 600/5 — but the choice behind it decides whether a metering scheme is accurate for the whole life of the installation. Pick a primary rating too high and the meter spends most of its time at the bottom of the accuracy band; pick one too low and the core saturates during normal peaks or faults. This guide gives worked ratio tables for 11kV and 33kV feeders based on transformer capacity, then walks through secondary rating, burden, accuracy class and the checks that turn a ratio into a complete specification.

Three toroidal current transformers of increasing size with matching primary copper bars
Figure 1. Three toroidal current transformers of increasing size with matching primary copper bars

How CT Ratio Relates to Primary Load

Start from the load, not from a catalogue. For a three-phase feeder, rated current is apparent power divided by root three times the line voltage: I = S / (√3 × U). A 1000kVA transformer on an 11kV system draws about 52.5A at full load; on a 33kV system the same transformer draws about 17.5A. The CT primary rating should sit comfortably above the expected maximum continuous load while keeping normal operation in the upper part of the measuring range — many engineers target normal load between roughly 30% and 100% of the CT primary rating, subject to the accuracy class and the utility’s rules.

Two other constraints matter. Future load growth needs headroom, otherwise the CT is replaced when the feeder is uprated. Protection cores need to be checked against maximum fault current and accuracy limit factor, which is a separate calculation from the metering ratio. And the final ratio must be one the supplier actually manufactures and type-tests; a 47/1 request will usually become 50/1 after a round of clarification. Browse the instrument transformer range to see the standard ratio families before freezing a schedule.

Worked Ratio Table for 11kV Feeders

The values below are illustrative calculations at 11kV using I = S / (√3 × 11kV). They are starting points for a schedule, not a substitute for the actual transformer data, diversity factor and utility metering rules on your project. Rounding up to the next standard primary rating is normal practice.

Transformer / loadCalculated current at 11kVCommon CT primary ratingTypical ratio
500 kVA26.2 A40 A or 50 A50/1
1000 kVA52.5 A75 A or 100 A100/1
1600 kVA84.0 A100 A or 150 A150/1
2500 kVA131.2 A150 A or 200 A200/1
5000 kVA262.4 A300 A or 400 A400/1
10 MVA524.9 A600 A or 800 A600/1

Worked Ratio Table for 33kV Feeders

At 33kV the same apparent power produces one third of the current, so the CT primary ratings shift down and the choice of secondary current and cable length becomes more sensitive. Note that a modest absolute rounding error in primary rating represents a larger percentage of the full-load current at this voltage.

Transformer / loadCalculated current at 33kVCommon CT primary ratingTypical ratio
1000 kVA17.5 A25 A or 30 A30/1
2500 kVA43.7 A50 A or 75 A50/1
5000 kVA87.5 A100 A or 150 A100/1
10 MVA175.0 A200 A or 250 A200/1
20 MVA350.0 A400 A or 500 A400/1
31.5 MVA551.1 A600 A or 800 A600/1

For the wider voltage-class context — including how 11kV, 22kV and 33kV systems differ in fault level and insulation — the 11kV, 22kV and 33kV VCB guide is a useful companion.

Selecting the Primary Rating

Three checks follow the arithmetic. First, confirm the maximum continuous current including any permitted overload, harmonic content and future uprating, then round up to a standard rating. Second, check the short-time thermal and dynamic ratings against the fault level at that point in the network — a 100/1 CT on a high fault level feeder may be thermally undersized even though the ratio fits the load. Third, confirm the accuracy limit factor for protection cores against maximum fault current and the total connected burden.

Do not size the CT to the transformer nameplate alone on a multi-transformer or ring-main feeder. The switching configuration can place the full combined load through one CT, and that worst-case configuration is the one that belongs in the schedule. A unit such as the LZZBJ9-10 current transformer is typically specified with ratio, class, burden and short-time rating stated together for exactly this reason.

Secondary Rating, Burden and Cable Length

A 1A secondary is generally preferable when the relay or meter is more than a short distance from the switchgear. Cable losses scale with the square of the secondary current, so a 5A circuit consumes roughly 25 times the VA of a 1A circuit over the same conductors. A 5A secondary remains perfectly reasonable for local panel meters and short runs, and some legacy schemes are built around it.

Burden must include the cables, terminal blocks, test links and all connected devices, not just the relay’s nameplate figure. Modern numerical relays have very low burden, which means the wiring can dominate the calculation — and a CT operating far below its rated burden may also fall outside its declared accuracy band. Calculate the total, then choose a rated burden that genuinely matches it. On a 33kV site with a long run to a control building, this calculation often decides the secondary rating.

Accuracy Class for Revenue Metering

For billing, 0.2S or 0.5S is usually the right choice. The S classes hold their accuracy down to a small fraction of rated current, which matters on feeders that run lightly loaded for long periods — industrial sites at night, seasonal loads, or a transformer installed with headroom for a future extension. A standard 0.5 class can under-register in that low-load region even though it is perfectly accurate near full load.

Also state the instrument security factor for metering cores. It limits the secondary current delivered to instruments during a primary fault, protecting the meter and the wiring. For the protection core, use a 5P or 10P class with an accuracy limit factor derived from the fault study, or a PX-class specification for differential schemes requiring a defined knee-point voltage. The two cores are separate design decisions on the same CT.

Multi-Ratio CTs and Tapping Arrangements

Some MV CTs offer several ratios from one unit, selected by secondary taps or by primary series/parallel connections. They are useful when load growth is planned but the final rating is not yet fixed. The catch is that accuracy class and burden are normally declared for a specific tap, and changing the tap changes the effective turns ratio and often the available burden and ALF. Record the selected tap, the declared class at that tap, and the wiring diagram in the as-built documentation.

On site, a multi-ratio CT with an undocumented tap change is a classic source of billing discrepancies. Verify the ratio by primary injection at commissioning and seal or label the tap link so the setting cannot drift during later maintenance. Where both metering and voltage measurement are involved, the JDZX10-10 voltage transformer is an example of the companion equipment that needs the same ratio and class documentation.

Protection Cores vs Metering Cores

ParameterMetering coreProtection core
Typical class0.2S / 0.5S5P20 / 10P20 / PX
Design priorityAccuracy at 1–120% rated currentLinearity at many times rated current
Behaviour at fault currentSaturates early to protect instrumentsStays unsaturated so the relay sees the fault
Key extra parameterInstrument security factorAccuracy limit factor or knee-point voltage
Burden sensitivityLow-load accuracy bandSaturation margin at maximum fault

Ratio Selection Checklist

Before issuing the schedule, collect the transformer kVA and voltage, maximum continuous load and overload allowance, the network fault level and X/R ratio, the cable route length and conductor size, the relay and meter burden data, the utility’s metering class requirements, the available standard ratios, and the number of cores needed. Then verify the short-time thermal rating, the ALF for protection cores, the instrument security factor for metering cores, and the single-point earthing arrangement. Finally, record the chosen tap and polarity on the as-built drawing. These checks belong in the specification of the medium voltage switchgear panel as a whole, because the CT cannot be validated in isolation from the wiring and the protection scheme.

Conclusion

A CT ratio is a short expression of a longer calculation. Start with apparent power and voltage, add realistic load growth and fault level, choose a secondary that suits the cable run, and then specify accuracy class and burden for each core separately. The worked tables above give sensible starting points for 11kV and 33kV feeders, but the final values should come from the project’s own load and fault data and from the standard ratios your supplier can type-test. If you are compiling a full panel schedule, the products overview helps match transformers, switchgear and metering equipment into one consistent list.

Frequently Asked Questions

How do I calculate the CT ratio for an 11kV feeder?

Compute full-load current as S / (√3 × U), then round up to a standard primary rating with allowance for overload and future growth. For example 1000kVA at 11kV gives about 52.5A, so a 75/1 or 100/1 CT is a common starting point.

Why does the same transformer need a smaller CT rating at 33kV?

Current is inversely proportional to voltage for a given apparent power. A 1000kVA transformer draws roughly 52.5A at 11kV but only about 17.5A at 33kV, so the CT primary rating scales down accordingly.

What is the difference between 0.5 and 0.5S accuracy class?

The S class maintains its accuracy at very low fractions of rated current. On lightly loaded feeders, a standard 0.5 core can under-register while a 0.5S core stays within its error band, which is why S classes are preferred for revenue metering.

Should I use 1A or 5A CT secondaries for a 33kV substation?

Normally 1A when the relay panel is remote from the switchgear, because cable losses scale with the square of secondary current. 5A is still fine for short local runs or where an existing scheme is built around it.

Can one CT core serve both metering and protection?

Rarely well. Metering cores are designed to saturate early to protect instruments, while protection cores must stay linear at many times rated current. Specify separate cores, or separate CTs, with their own class, burden and documentation.

Previous Post

CT and VT Burden, Accuracy Class and MV Panel Wiring

Next Post

Pin vs Post vs Suspension Insulator: Selection by Voltage

Related Posts

Get A Free Quote
Get more information about our products
+86-16558668888 Phone sales01@cnsovio.com E-mail